iWBMS Ekinox

Norbit iWBMS Ekinox

Ekinox.png

iWBMS Ekinox

Integrated bathymetry with SBG Ekinox

iWBMS Ekinox combines SBG Ekinox GNSS/INS with broadband multibeam sonar. Its compact arrangement supports mobilisation for shallow-water, harbour, river and coastal surveys. An integrated NTRIP client and Ethernet interface support correction-data and survey-data integration. Ekinox navigation specifications differ from Applanix-based iWBMS models; comparisons should use the same antenna spacing and positioning solution.

Survey workflow and quality control

Before mobilisation, the coordinate system, vertical reference, antenna offsets and sonar mounting geometry are defined. Sound-speed profiles, time synchronisation and angular alignment are checked during trial lines. Sonar observations are assessed alongside position and motion data, with overlapping lines and cross lines used to check consistency.

Deliverables can include a bathymetric surface, sections, a seabed model for volume calculations or structure inspection data, depending on the application. Acoustic resolution alone does not represent final georeferenced survey accuracy. Water depth, seabed material, vessel motion and selected software options are considered together when specifying the system.

Technical specifications

GNSS/INSSBG Ekinox
Frequency400 kHz nominal; 200–700 kHz
Swath sector5–210°
Ping rateUp to 60 Hz
Housing depth rating100 m
InterfaceEthernet
Acoustic depth range0.2–275 m; for 0.9° × 0.9° in the brochure >300 m
Beam width0.9° × 0.9° @ 400 kHz; 0.5° × 0.5° @ 700 kHz
Beam count256–512
Range resolution<10 mm; 80 kHz bandwidth
Heading accuracy0.03° RTK; 2 m antenna separation
Roll / pitch accuracy0.02° RTK
Power60 W

Specifications follow the original manufacturer brochure PS-210031-4. Acoustic range is distinct from housing depth rating. Options and operating conditions affect achievable performance.

The technical reference for this model is the existing original brochure revision. Current hardware options and availability should be confirmed for the project.

Brochures